The Challenges

PlantPRO has been installed on the two main chiller systems in service at the Westfield Hornsby shopping centre. This report was commissioned following discussions between Westfield, OEH, JCM and Airmaster that concluded that the original M&V study should be revised and hopefully improved with the inclusion of humidity data. The study is designed to predict the relative performance of the PlantPRO logic compared to the older chiller control regime on the McQuay Chiller System at Westfield Hornsby.

Read the full M&V Report here

Project Description

Client:Westfield
Location:Hornsby NSW