The Challenges

PlantPRO® was installed at this site to both optimise the operation of the central plant and to provide advanced measurement and reporting capabilities to the facility. Control strategies included active lift optimisation through a combination of chilled water and condenser water reset and further enhanced with variable speed primary pumping control. In addition to this, optimised chiller sequencing was employed to ensure the best-fit chiller was always sequenced for the given building load.

Read the full case study here

Project Description

Client:Knight Frank
Location:Innovation Place, North Sydney NSW
Surface Area:23 Storey A-grade Office Building
Value:11% Energy Savings. $42,600 Annual Cost Saving