The Challenges

Results of an analysis showed the chiller to be performing within allowable limits. PlantPRO® did highlight some operational issues with the chiller including a refrigerant control valve fault and an issue with the chillers set point calibration. These issues were quickly rectified by the manufacturer under warranty leaving both the consultants and Property Managers confident in the new chillers overall performance.

Read the full case study here

Project Description

Location:40 Cameron Avenue, Canberra ACT