WHAT OUR CUSTOMERS SAY
417 St Kilda Road, Melbourne
"We installed PlantPRO into a commercial office to check and verify the performance of two newly installed Chillers and to optimise the chiller plant's overall Energy Consumption. PlantPRO allows us to monitor and log plant efficiency and provides us with the tools to fine tune overall plant operation while at the same time receive alerts in advance should any issues arise. Dynamic optimization of both chilled water and condenser water temperatures are also carried out by PlantPRO making this system not only an extremely effective monitoring and verification tool but also a self-tuning Chiller Plant Control System that readjusts operating parameters based on performance feedback.
We are very pleased with the results achieved using PlantPRO."
David Odd, Energy & Sustainability Engineer
Cameron Avenue, Canberra
Results of an analysis showed the chiller to be performing within allowable limits. PlantPRO did highlight some operational issues with the chiller including a refrigerant control valve fault and an issue with the chillers set point calibration. These issues were quickly rectified by the manufacturer under warranty leaving both the consultants and Property Managers confident in the new chiller’s overall performance.
Learn more: Full Case Study
Corio Shopping Centre, Corio
Pro-active Cost Avoidance made operating efficiently. 300 hours per month @ an average of 130 kW equates to a running cost of approximately $2,700 per month. Had this problem gone unchecked, costs could have conservatively added another $5,000/m to operational costs.
Learn more: Full Case Study
Martin Place, Sydney
The PlanPRO trial improvements resulted in annual savings to operating costs of approximately $21,420. Further evidence PlantPro is an extremely powerful diagnostic tool with the ability to drill down to the relevant areas and study effects in detail
Learn more: Full Case Study
MGM Grand, Macau
"By using PlantPRO and EffTrack at MGM Grand Macau, we saved USD$2.8M (23%) within in the first 12 months of operation"
John Leslie, MGM Global Energy Manager
Learn more: Full Case Study
AIA Tower, Macau
"By using PlantPRO and EffTrack, we were able to save 40% of energy consumption on the Chiller plant compared to the previous year"
Clement Browne, Technika Trading, Energy Consultant
Airmaster
"We have Conserve It’s portable kits excellent for commissioning Chillers because we can prove it is properly commissioned i.e. the water flows are on design, the refrigerant charge is correct, Chiller loading rates are correct, and may other things."
Peter MacPherson, CFSGAM National Account Manager
Royal Orchid Sheraton, Bangkok
"In South East Asia there is a bias towards cost savings and reliability in Chiller management and EffTrack delivers this for us. Conserve It staff were also able to involve, often sceptical, maintenance staff in the project ensuring maximum benefit from the test of the EffTrack system"
Ross Crowder, Director, Technical Services Asia Pacific for Starwood Asia Pacific Hotels and Resorts.
Bayside Shopping Centre
"Conserve It installed their Cooling Tower Optimisation program on the McQuay Chiller and were able to easily save 10% of energy consumption"
Queens Rd, Melbourne
"The Conserve It guys helped us resolved the CHW pumping issues. They came in with all the necessary equipment and carried out the calculations on the spot”
Darren Tremlett, TCM Solutions
Vistakon Pharmaceuticals, Ireland
By installing EffTrack at Vistakon and receiving specialised custom reports from Conserve It engineers, we have been able to identify a number of system related issues which in turn have reduced system running costs.
Steve Chadwick, Retrofit Solutions, UK
Jupiters Hotel & Casino
By using EffTrack, we identified a refrigerant leak on the base load Chiller 3 weeks before we could prove the Chiller was short of refrigerant. We won’t make that mistake again.
Graeme Smithers - Engineering Manager - Conrad Jupiters
Airmaster
"We like PlantPRO diagnostics because when our mechanics go to site, they know exactly what to check first."
Pat McManus - VIC Service manager
Abbott, Ireland
EffTrack identified Chiller hunting which was investigated on-line and in conjunction with site facilities engineers. Chilled water control was very erratic for the system with Chillers frequently starting and stopping. EffTrack allowed us to identify that when the Chiller cycled off its cooling water flow dropped by 50% (not off completely as designed). It transpired that cooling tower system controls had been recently modified by the BMS contractor and this had resulted in incorrect sequencing of valves & pumps. Our remote diagnosis allowed client to clearly instruct BMS contractor on defects and he reprogrammed tower control software accordingly.
David Marley, Retrofit Solutions, UK
Learn more about our: Plant Efficiency Solutions
- END -